Building a steel factory is easy!

2023-05-24

As we all know, traditional buildings are built in concrete way, however, concrete buildings are built slowly and with small span, which cannot meet the requirements of modern society development, therefore, steel structure buildings come into being in response to the market demand.

Compared with brick and mortar buildings, it has obvious advantages in environmental protection, energy saving, high efficiency, factory production, etc. It is easy to install, the structure is versatile, and the color of the plant can be changed according to the enterprise VI design, which is beautiful and fashionable.

A building structure are formed by different parts, many people who do not understand, will feel that the construction of steel structure plant is very complex. In fact, the steel structure plant itself as an assembled building, many parts and steel components are taken factory production site assembly way to build and become, the construction time is fast, which is undoubtedly cost-saving for enterprises at the same time can also improve economic efficiency as soon as possible.

The construction of steel structure plant is mainly divided into the following parts:

1、Pre-embedded parts

Pre-embedded parts bear a larger force support, good pre-embedded to make the structure has intact vitality. Many plants are used to cast concrete structures for the foundation, and then install steel structures. Steel structure plant pre-buried parts is the essence of the whole project, the stability of the whole structure depends on whether the pre-buried parts are installed in place and can do a good job.

2、Steel column

Generally with H section steel or C section steel and other steel composition, steel column is an important part of the entire steel structure plant support, in all directions with strong bending resistance, construction is simple, cost-saving and light weight structure and other advantages, so the steel column steel quality must pass, poor quality steel will lead to steel column bearing capacity decline, resulting in the entire steel structure plant quality decline.

3、Steel beam

Generally use C section steel and H section steel, the height of the intermediate product according to the span of the beam to determine, steel beam is to some have a crane or other components of the more important part, steel beam is equivalent to the roof frame support body, is an important part of the composition of the framework.
4、Purlin

C and Z sections are usually used. C sections are automatically processed and formed by C section forming machine, and Z sections are a common cold-formed thin-walled section. The horizontal parts distributed along the length of the roof in the steel structure, located on the main rafters, supporting the secondary roof rafters is purlin.

5、Roof and wall

Roof and wall maintenance system can use single-layer pressure plate and composite sandwich panel.

6、Doors and windows

Aluminum alloy and plastic steel are the primary choices.

Henan Huabo Green Building Technology Co.is a professional factory with 13 years of experience in manufacturing steel structure, our main business scope is light steel structure, heavy steel structure, mesh structure, pipe truss structure, membrane structure, curtain wall project, etc. Our buildings are widely used in warehouses, workshops, hangars, farms, villas, bridges, stadiums, multi-story buildings, exhibition centers, prefabricated houses, etc. We provide free drawing design and sample for customers, if you are interested in our products, please leave your contact information, thank you!